Last updated: 1 Nov 2026 | 6735 Views |
The main steps are: build the foundation, lay the blocks, fill soil inside the blocks and behind the wall, compact, and add GeoGrid depending on the wall height. Low walls do not need it.
Enquiries: tel. 061-403-4448 · LINE @ccp-pavingstone · cpscenter@ccp.co.th
4 Jul 2019
17 Jul 2019
4 Jul 2019